Aiskew Leeming Bar CP School

« Back to Portfolio

Details

Year 1/Reception Classroom, Toilet Area, Wet Area and Cloakrooms

After stripping out the original fittings, structural changes were made by blocking up existing doorways and making new openings into the newly refurbished toilet areas and wet areas where new external doors were created to provide an access point for play from the classroom.

Externally; Children’s Play Area and Canopy

We created a new canopied play area by stripping away the existing paving flags, excavating foundations and enhancing levels to a covered area. This created a level access point from the classroom.

Once the canopy was installed, a new tarmac surface was put down and we made a new base for the shed. The areas from the canopied area to the shed, and on to a planting area were all linked by paved walkways.

Yr 5 / 6 Classroom Toilet Area & Cloakroom

We removed all the original fittings, including sanitaryware, wall tiling and cloakroom furniture. All of the existing external door and side panels were taken out, and we slightly reconfigured the door position to allow for a new external layout.

We installed new sanitaryware with bright new wall tiling and decoration throughout.

Outside, a new ramp and raised platform was installed to create disabled access to the main school entrance.